Packages Starting at $500  ·  Free On-Site Quotes  ·  No Hidden Fees
Get a Free Quote→ (864) 340-9450
New & Used Homes

Mobile Home Installation

Bought a wooded or overgrown lot? Hire one contractor for the whole job. We take it from raw land to a set home — everything except hauling the home itself.

One Crew. Whole Project.

Picture buying a piece of land that's completely grown over. There's no clearing, no pad and no driveway — nowhere to put a home. You hire us, and we do the whole project except haul the home.

New from the dealer or used from a seller, the ground work is the same. Madison is on the job from the first tree to the final grade, so you deal with one person the whole way through.

01

Land Clearing

Trees, brush and undergrowth cleared, including the path in from the road.

02

Grading & Pad

Cleared ground graded smooth into a building pad for the home.

03

Footers

Marked out, drilled and poured to carry the home.

04

Topsoil

Fresh topsoil spread around the finished home.

05

Grass

Seeded so the lot turns into a yard instead of bare dirt.

06

Driveways

Shaped and surfaced from the road to the front door.

Overgrown Woods to Set Home

Follow one install through every stage, in order. Same lot, same job, start to finish.

01

The Lot

Thick woods, no access and nowhere to set a home. Before any equipment moves, we walk the property, plan the pad and map out the way in.

Overgrown wooded lot before land clearing for a mobile home
Before — overgrown lot
02

Land Clearing

Trees, brush and roots come out with skid steers, including the path in from the road.

Two skid steers clearing trees and brush from a wooded lot
Skid steers at work
Partially cleared lot with trees still standing behind
Clearing in progress
03

Grading the Pad

The cleared ground is graded smooth into a building pad, ready for footers.

Cleared and graded dirt pad for a mobile home with tread marks from the grading pass
Graded pad
04

Footers

Footer locations are marked with stakes and string lines, drilled with an auger, then filled with concrete.

Skid steer auger attachment drilling a footer hole at a staked location
Auger at the stake
Footer holes dug in a grid with string lines and piles of red clay
Footer holes laid out
Concrete mixer truck on the pad next to the drilled footer holes
Concrete on site
05

Home Set & Blocked

With the pad and footers ready, the home goes on block piers with a moisture barrier laid on the ground underneath.

Cleared access drive leading up to a mobile home set on its piers
Access drive to the home
Gray mobile home set on the graded pad surrounded by trees
Home on the pad
Side view of a gray mobile home with dark shutters set on block piers
Home set on piers
Low view along the underside of a mobile home showing block piers and ground moisture barrier
Piers and moisture barrier
Close-up of stacked concrete block piers under a mobile home with perimeter pier blocking labels
Block piers up close
06

The Finish

Every install ends with the work that makes it feel like a home.

TopsoilSpread around the home and across the yard.
GrassSeeded so the yard fills in.
DrivewayShaped and surfaced from the road to the home.

Another Install, Same Result

A second home in Upstate SC, from a cleared site to a home in place.

Cleared red clay site with footer locations marked and equipment in the background
Cleared site, footers marked
Blue mobile home being set on its piers with a dozer beside it
Home being set
Blue mobile home on piers with rough grading and rocks in the foreground
Home in place, grading underway
Blue mobile home with the surrounding yard cleared and graded
Yard cleared and graded

We handle

  • Land clearing
  • Grading and the building pad
  • Digging and pouring footers
  • Topsoil and grass
  • Driveways

We don't

  • Haul the home to your property

Hauling is arranged separately. Everything on the land is ours.

Want to see how every job runs? Read our process or browse the full gallery.

Got land and a home picked out? Let's get the ground ready.